Mokha Projects & Trading SPC

موخا للمشاريع والتجارة

SULTANATE OF OMAN

Designing for Tomorrow.

Management-led interior fit-out and project delivery, strengthened by planning, project controls and disciplined coordination.

Completed contemporary interior fit-out with stone finishes, custom joinery and teal accents
INTERIOR FIT-OUT

FIT-OUT, DETAIL BY DETAIL

Craft you can see.
Coordination you can trust.

From precise finishes to building services, every interface matters. Explore the details that bring a finished space together.

01 · FLOORING & FINISHES

Carpet, Floor & Wall Tiling

Accurately installed carpet and tiled finishes, joined with clean, considered transitions.

02 · SERVICES

Electrical & Plumbing

Lighting, power and plumbing services coordinated with the finished interior.

03 · PARTITIONS

Aluminium & Glass

Aluminium-framed glazing and clear partitions, carefully measured and cleanly finished.

04 · BESPOKE JOINERY

Bespoke Joinery & Carpentry

Custom cabinetry, timber wall features and detailed carpentry made for each space.

05 · BUILDING SERVICES

HVAC

Air distribution and equipment coordinated with the ceiling layout.

06 · FIRE & LIFE SAFETY

Fire Fighting

Sprinkler and alarm systems carefully integrated into finished spaces.

07 · IT & SECURITY

IT & ELV Systems (CCTV)

Security, structured cabling and low-voltage systems coordinated with the finished space.

08 · CEILINGS & WALL FINISHES

Gypsum, Painting & Wall Decoration

Coordinated ceiling and wall finishes, completed with clean lines and considered detailing.

خدمات موخا

مساحات متقنة.
وتنفيذ يمكنك الوثوق به.

خدمات متكاملة للتصميم الداخلي والتجهيز، من التخطيط إلى التسليم.

01

الأعمال الميكانيكية والكهربائية والسباكة

02

تخطيط المساحات

03

الدهانات وديكورات الجدران

04

التصميم الداخلي للشركات

05

مكافحة الحريق وإنذار الحريق

06

الخدمات المعمارية

07

عقود المشاريع وتسليم المفتاح

08

أعمال تبليط الأرضيات والجدران

09

تصميم المساحات التجارية: المتاجر والفنادق والمستشفيات

10

القواطع والأسقف المستعارة

THE MOKHA APPROACH

Turnkey is more than execution.

Successful turnkey Projects depend on programme logic, technical interfaces, procurement, communication, commercial awareness and close-out. Mokha brings those disciplines together.

WHY MOKHA

Management-led by Focus.

SPACE PLANCEILING PLANPLAN · COORDINATE · DELIVER
01

Plan with purpose

02

Coordinate Timely

03

Report clearly

04

Close-out professionally

YOUR NEXT PROJECT

Let’s turn the brief into a controlled delivery plan.

Discuss Your Project →
Interior fit-out project plans, material samples and finish selections arranged on a studio table